Project realised in July 2019 with the installation of a pneumatic safety gate on a traditional pit.
The concrete pit has been perfectly realized with the concrete step of 20mm all around the gate to integrate all the grates and trapdoors.
The air compressor and control box is located about 20 meters from the startgate.
Weilzheim, GERMANY
8-rider galvanized steel safety gate
Pneumatic ram
PROBOX