Puget-Ville, FRANCE

July 26th, 2017 Posted by 0 thoughts on “Puget-Ville, FRANCE”

INFOS

The project was installed end of June 2017, and as you can see does not include just a gate but the whole structure as well. We designed an all-in-one startgate with ramp access, waiting zone, handrails and our quarter barrel pneumatic gate!

 

www.bmxpugetville.fr/

PROJECT LOCATION

Puget-Ville, FRANCE

EQUIPMENTS INSTALLED

8-rider waiting zone before the gate

8-rider structure under the gate

8-rider galvanized safety gate

Prostart pneumatic system

High Springs, USA, Florida

July 26th, 2017 Posted by 0 thoughts on “High Springs, USA, Florida”

INFOS

We finished this project in December 2016

The track operator John even added a « personal touch » with color lights under the gate in order to bring some animation during gate session !

 

www.facebook.com/HighSpringsBMX/

PROJECT LOCATION

High Springs, USA, Florida

EQUIPMENTS INSTALLED

8-rider structure under the gate

8-rider galvanized safety gate

Prostart pneumatic system

MSC Strudelbachthal, GERMANY

November 7th, 2016 Posted by 0 thoughts on “MSC Strudelbachthal, GERMANY”

INFOS

That project has been finished in October 2016 and it was one of our biggest project of the year. With a clubhouse under the starthill, we have designed a all-in-one startgate with ramp access, waiting zone, handrails, …

Composed of only 5 concrete plots, the whole structure is both light & sturdy.

PROJECT LOCATION

Eberdingen, GERMANY

EQUIPMENTS INSTALLED

8-rider waiting zone before the gate

8-rider structure under the gate

8-rider galvanized safety gate

Prostart pneumatic system

Adelaide, AUSTRALIA

November 7th, 2016 Posted by 0 thoughts on “Adelaide, AUSTRALIA”

INFOS

That 2-rider safety gate has been made for an indoor Cycling facility in Australia. They chose to order a 100% electric gate for its benefits about low-maintenance and very low noise.

We have sent the 2-rider gate complety ready to use in order to facilitate the installation on site. (Size of the palet: 2000x1000x2250mm)

Name of the indoor facility : PUMPT-T

PROJECT LOCATION

Adelaide, AUSTRALIA

EQUIPMENTS INSTALLED

2-rider structure under the gate

2-rider aluminum safety gate

Electric ram (no compressor)

E-BOX (no control room)

Bobigny, FRANCE

November 7th, 2016 Posted by 0 thoughts on “Bobigny, FRANCE”

INFOS

That project has been finished in November 2015 and regroups all the modern parts of BMX Racing, including 5m starthill, track with new UCI formats and our pneumatic gate. All the Prostart system has been installed in order to give the most of comfort than possible to users.

Starter area at the outside and access ramp at the inside in order to circulate around the gate even if it is up or down.

PROJECT LOCATION

Bobigny, FRANCE

EQUIPMENTS INSTALLED

8-rider structure under the gate

8-rider galvanized safety gate

Prostart pneumatic system

Circle City, USA

November 7th, 2016 Posted by 0 thoughts on “Circle City, USA”

INFOS

That project has been finished in May 2016 and its the Third full Prostart gate in the US. We started to talk with the track operator in March, they ordered the gate in April and 4 weeks later we was on site to install everything.

The concrete pit was well realized and the final result is great. With PROEVENT Race Display and PROTRAINING Timing System, that club has everything in their hand to become on of the best tracks in the US.

PROJECT LOCATION

Circle City, Alabama, USA

EQUIPMENTS INSTALLED

8-rider structure under the gate

8-rider galvanized safety gate

Prostart pneumatic system

Logan City, AUSTRALIA

November 7th, 2016 Posted by 0 thoughts on “Logan City, AUSTRALIA”

INFOS

That project has been finished in September 2016 and it was the furthest project in the whole life of Prostart company. Thanks to the help of Glenn Codega, track operator and coach of the club, we have got the contract in March 2016 in order to install the first 100% electric gate in Australia and Oceania.

Our 100% electric gate doesn’t use any compressor and big control room, only the E-BOX at the side of the gate in a compact container.

You can read a nice article about the history of Logan BMX and watch a nice edit of the gate installation. The link :

http://bmxultra.com/news/logan-citys-new-prostart-gate/

PROJECT LOCATION

Logan City, Queensland, AUSTRALIA

EQUIPMENTS INSTALLED

8-rider aluminum safety gate

Electric ram (no compressor)

E-BOX (no control room)

Montlucon, FRANCE

January 23rd, 2016 Posted by 0 thoughts on “Montlucon, FRANCE”

INFOS

That project has been finished in September 2016 and regroups all the modern parts of BMX Racing, including 5m starthill, track with new UCI formats and our 100% electric gate. There is no compressor or control room closed to the gate, only the E-BOX at the side of the gate.

PROJECT LOCATION

Montlucon, FRANCE

EQUIPMENTS INSTALLED

8-rider structure under the gate

8-rider aluminum safety gate

Electric ram (no compressor)