Saint-Etienne, FRANCE

November 7th, 2016 Posted by 0 thoughts on “Saint-Etienne, FRANCE”

INFOS

That project has been finished in June 2016 and it was the biggest project for Prostart ever. Manage the realization of a complete starthill, from foundation to small details, was very educational and interesting. The installation of the starthill has been done in less than 10 weeks, from concrete foundation preparation to the installation of the draining concrete at the bottom of the starthill.

That installation can be used during any weather conditions and with the choice of concrete, it will last forever.

PROJECT LOCATION

Saint-Etienne, FRANCE

EQUIPMENTS INSTALLED

Prefabricated concrete starthill

Galvanized ramp access “Scissors style”

Galvanized full handrails

Drain concrete from bottom starthill to first jump

Prostart electric straight gate “Olympic Edition”

Montlucon, FRANCE

January 23rd, 2016 Posted by 0 thoughts on “Montlucon, FRANCE”

INFOS

That project has been finished in September 2016 and regroups all the modern parts of BMX Racing, including 5m starthill, track with new UCI formats and our 100% electric gate. There is no compressor or control room closed to the gate, only the E-BOX at the side of the gate.

PROJECT LOCATION

Montlucon, FRANCE

EQUIPMENTS INSTALLED

8-rider structure under the gate

8-rider aluminum safety gate

Electric ram (no compressor)

E-BOX (no control room)